UV Resin-Bound Gravel Driveway Beckenham

Client: Mr Williams
Site: Beckenham
Timescale: 4 Days

What the client asked for – New resin driveway in Beckenham

Why we chose the option we did – We recommend a resin-bound driveway because they look great and are highly durable.

Finished project – the client was delighted with their finished driveway.

CONTACT US

Before

After

Before

After

Before

After

Resin-bound driveway project

Client: Mrs Brown
Site: Croydon
Timescale: 2 Weeks

Scope of Works:

This project required a full removal of all old stonework, and ground levelling to provide a flat surface for the client. We then installed the MOT Type 3 hardcore base and a geotextile membrane before adding the final substrate resin mix.

CONTACT US

Before

After

Before

After

Kandla Grey Porcelain Patio

Client: Mr George
Site: Bromley
Timescale: 2 Weeks

Scope of Works:

Kandla Grey outdoor porcelain paving has a lightly gentle riven surface, which makes it extremely authentic to the eye and touch. This means it is the perfect choice of paving for outdoor patios, garden paths and can also be used on commercial paved areas with its high slip resistance.

CONTACT US

Before

After

Before

After

New Tegula blocked paved driveway project

Client: Mr Taylor
Site: Purley
Timescale: 4 Weeks

Scope of Works:

Tegula block paving is a multi-size, lightly weathered paving system, designed to resemble natural stone setts. This versatile range offers flexibility to complement conservation projects and enhance distinctive showpiece schemes

CONTACT US

Before

After

Before

After

Before

After

New Tegula blocked paved driveway project

Client: Mrs Jones
Site: West Wickham
Timescale: 2 Weeks

Scope of Works:

Tegula block paving is a multi-size, lightly weathered paving system, designed to resemble natural stone setts. This versatile range offers flexibility to complement conservation projects and enhance distinctive showpiece schemes.

CONTACT US

Before

After

Before

After

After

After

New Resin-bound landscaping swimming pool project

Client: Mr Smith
Site: Orpington, Kent
Timescale: 3 weeks

Scope of Works:

This project required a full removal of all old stonework, and ground levelling to provide a flat surface for the client. We then installed the MOT Type 3 hardcore base and a geotextile membrane before adding the final substrate resin mix.

Works consist of: