New Resin-bound landscaping swimming pool project

Client: Mr Smith
Site: Orpington, Kent
Timescale: 3 weeks

Scope of Works:

This project required a full removal of all old stonework, and ground levelling to provide a flat surface for the client. We then installed the MOT Type 3 hardcore base and a geotextile membrane before adding the final substrate resin mix.

Works consist of:

CONTACT US

Before

After

Before

After

Before

After