Resin-bound driveway project
Client: Mrs Brown
Site: Croydon
Timescale: 2 Weeks
Scope of Works:
This project required a full removal of all old stonework, and ground levelling to provide a flat surface for the client. We then installed the MOT Type 3 hardcore base and a geotextile membrane before adding the final substrate resin mix.

Before

After

Before